Annual Permit ONLY Application (Effective August 1, 2022 through July 31, 2023)
DO NOT leave questions blank. Incomplete applications will be returned.
You must provide an answer to every question. If the question is not applicable, write “N.A.” or “Not Applicable.”
What is an HRRA permit and who is required to have one?
The HRRA Permit gives access to the HRRA transfer stations for municipal solid waste including junk/residential bulky (under 4’). Permit holders are charged the contracted HRRA MSW Tip Fee and there is no minimum tonnage. The HRRA Permit does not cover construction and demolition debris tip fees. The 2022-23 MSW Tip Fee effective July 1, 2022, is $98.43. This does not include any current fuel and or transportation surcharges.
More information about the HRRA permit and current tip fees can be viewed at https://hrra.org/haulers/